QUESTION 1
What is the minimum number of CPU sockets that must be populated in a BL890c i2?

A.    1
B.    2
C.    4
D.    6

Answer: C

QUESTION 2
Which HP tool can you use to detect and analyze server hardware bottlenecks?

A.    Insight Control Virtual Machine Management
B.    Insight Control Server Deployment
C.    Insight Control Server Migration
D.    Insight Control Performance Management

Answer: D

QUESTION 3
Which filesystem can be used on a Linux operating system?

A.    EXT3
B.    NTTFS
C.    EVFS
D.    HFS

Answer: D

QUESTION 4
What is the name of the core-to-core transport mechanism used in Intel XEON processors?

A.    Quick Path Interconnect
B.    Crossbar switch
C.    Hyper Transport
D.    Northbridge

Answer: B

QUESTION 5
A customer bought a new HP BladeSystem c7000 enclosure with HP Flex-10 interconnect modules. Which HP BladeSystem installation and startup Service is needed to implement the network configuration of the HP Flex-10 modules?

A.    Network Infrastructure service
B.    Startup BladeSystem c-Class infrastructure service
C.    Enhanced Network service
D.    Enclosure Connectivity service

Answer: C

QUESTION 6
A customer needs many HP BladeSystem servers equipped with additional server options. The solution must be racked and cabled before delivery. Which HP service should be recommended?

A.    Config to Order
B.    Optimized Care
C.    Rapid Deployment
D.    Factory Express

Answer: D

QUESTION 7
You are planning the installation of a new HP BladeSystem c7000 enclosure with HP Virtual Connect Flex-10 modules. The customer expects that a Flex-10 configuration will be implemented in addition to the physical setup of the hardware. Which HP services should you recommend? (Select two)

A.    HP Startup Blade System c-Class Enhanced Network Service
B.    HP Install c-Class Connectivity Solution package
C.    HP Install c-Class Enclosure & Server Blade Service
D.    HP 3-year Next Business Day c7000 Enclosure Hardware Support
E.    HP Blade System VLAN Implementation Service

Answer: AC

QUESTION 8
An engineer installs four HP Virtual Connect Flex-10 10 Gb Ethernet modules into a c7000 enclosure. What is required to enable all Ethernet NICs on all servers to have access to any Virtual Connect Ethernet module uplink port?

A.    External stacking links between the interconnects
B.    Virtual Connect Enterprise Manager license
C.    HP Insight Control central management server (CMS)
D.    Internal stacking link enablement for all modules in the Onboard Administrator interface

Answer: D

If you want to pass HP HP0-S35 successfully, donot missing to read latest lead2pass HP HP0-S35 exam questions.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/HP0-S35.html

         

Why Choose Lead2pass?

If you want to pass the exam successfully in first attempt you have to choose the best IT study material provider, in my opinion, Lead2pass is one of the best way to prepare for the exam.

Lead2pass Testking Pass4sure Actualtests Others
$99.99 $124.99 $125.99 $189 $29.99-$49.99
Up-to-Dated
Real Questions
Error Correction
Printable PDF
Premium VCE
VCE Simulator
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back

Comments are closed.